A Private Organization Utilizes the Best Value Approach on an Enterprise Resource Planning System
DOI:
https://doi.org/10.30564/jcr.v1i2.718Abstract
The Best Value Approach (BVA) is a new project delivery method that has been developed at Arizona State University. It has been documented to increase performance and value on projects by the identification and utilization of expertise instead of management, direction, and control (MDC). It utilizes performance information that is simple, observable, and countable. It allows the expert vendor to know what the client project requires, why they can achieve success and what they will do before they do it. The tracking of the project cost and time deviation requires an initial plan and method to track it. Preliminary results of the BVA have shown a 90% decrease in effort by client organizations, 98% customer satisfaction and has led to 1% vendor cost and time deviation rate. It applies to construction, services/IT projects, and any long-term service. In 2014, a large private organization having difficulty delivering information technology (IT) and construction/facility services identified the BVA as a potential solution. This paper will summarize a major IT Enterprise Resource Planning case study that the large private organization used the BVA on and identify the full results.
Keywords:
Best Value Approach; Information Technology; Large Private Organization; ERP Systems; Procurement.References
[1] CII.(2015).CII 25–Building on 25 Years.Construction Industry Institute.Web.(2 October 2015).Retrieved from https://www.constructioninstitute.org/scriptcontent/more/cii_25_more.cfm
[2] CII.(2015).Performance Assessment 2015 Edition.Construction Industry Institute.Web.(2015).Retrieved from http://www. Construction-institute.org/performance.
[3] Deming,EW.(1982).Out of the Crisis,Massachusetts Institute of Technology, Cambridge.
[4] Duren,J.and Doree,A.(2008) An evaluation of Performance Information Procurement System(PIPS),3rd international public procurement conference proceedings 28(30) pp 923-946.
[5] Egan,SJ 1998,‘Rethinking Construction:The Report of the Construction Task Force to the Deputy Prime Minister,John Prescott,on the scope for improving the quality and efficiency of UK construction.',The Department of Trade and Industry,London.
[6] Goff,S.(2014).“IPMA Education and Training Board Series:Closing the Gap between PM Training and PM Performance:Part 2: Closing the Gap.”PM World Journal, Vol 3(7).
[7] IHS Markit(2013).Public Annual Reports;press releases.IHS Herold Global Projects Database.Retrieved from: http://www.herold.com/research/industry_research.home
[8] Kashiwagi,D.T.,Savicky,J.and Kashiwagi,A.(2002)“Analysis of the Performance of‘Best Value'Procurement in the State of Hawaii”ASC Proceedings of the 38th Annual Conference Virginia Polytechnic Institute and State University-Blacksburg,Virginia,pp.373-380(April 11,2002).
[9] Kashiwagi,J.S.,Malhotra,N.,Luna,E.,Kashiwagi,D.T.,& Sullivan,K.T.(2009).Creating organizational change:Minimizing client generated construction inefficiencies at the US army medical command. In Construction Research Congress 2009:Building a Sustainable Future (pp.370-379).
[10] Kashiwagi,J.(2013).Dissertation.“Factors of Success in Performance Information Procurement System / Performance Information Risk Management System.”Delft University, Netherlands.
[11] Kashiwagi,D.(2018).How to Know Everything Without Knowing Anything Vol.2”,Performance Based Studies Research Group,Mesa,AZ.Publisher:KSM Inc., 2018.
[12] PBSRG.(2018).Performance Based Studies Research Group Internal Research Documentation,Unpublished Raw Data.
[13] PBSRG.com.(2018).Academic and Research Papers. Performance Based Studies Research Group.Retrieved from https://pbsrg.com/resources/.
[14] Rivera,A.(2017).Dissertation,Ph.D.“Shifting from Management to Leadership:A Procurement Model Adaptation to Project Management.”Arizona State University.
[15] State of Hawaii PIPS Advisory Committee(2002),Report for Senate Concurrent Resolution No.39 Requesting a Review of the Performance Information Procurement System (PIPS),Honolulu,HI: U.S.
[16] Government, Available from: http://Hawaii.gov/dags/rpts/pips.pdf>.
Downloads
Issue
Article Type
License
Copyright and Licensing
The authors shall retain the copyright of their work but allow the Publisher to publish, copy, distribute, and convey the work.
Journal of Construction Research publishes accepted manuscripts under Creative Commons Attribution-NonCommercial 4.0 International License (CC BY-NC 4.0). Authors who submit their papers for publication by Journal of Construction Research agree to have the CC BY-NC 4.0 license applied to their work, and that anyone is allowed to reuse the article or part of it free of charge for non-commercial use. As long as you follow the license terms and original source is properly cited, anyone may copy, redistribute the material in any medium or format, remix, transform, and build upon the material.
License Policy for Reuse of Third-Party Materials
If a manuscript submitted to the journal contains the materials which are held in copyright by a third-party, authors are responsible for obtaining permissions from the copyright holder to reuse or republish any previously published figures, illustrations, charts, tables, photographs, and text excerpts, etc. When submitting a manuscript, official written proof of permission must be provided and clearly stated in the cover letter.
The editorial office of the journal has the right to reject/retract articles that reuse third-party materials without permission.
Journal Policies on Data Sharing
We encourage authors to share articles published in our journal to other data platforms, but only if it is noted that it has been published in this journal.