Abstract: In order to realize the standardization and normalization of environmental protection project management. This paper uses the literature method to study the current status of the existing project management mode, and points out the problems: lack of a sound project management system, insufficient information application of project management, and unclear decentralization in project management; on... More
Abstract: With the continuous implementation of the PPP projects, due to the imperfection of relevant policies, the blindness of government subsidy is constantly emerging. Thus, it is important to put forward a practical approach for valuing the subsidies and risk. In this paper, the revenue subsidies model and traffic subsidies model are established. Then combined with... More
Abstract:
The Hong Kong-Zhuhai-Macao Bridge(HZMB) project, which has just been opened to traffic in 2018. The special location, construction conditions, quality requirements and multiple functions of HZMB brought many challenges, such as management, technology, safety and environmental protection. To meet these challenges and ensure the achievement of high quality and 120 years design service life, the HZMB project first introduced the completely new concept of... More
Abstract:
This paper introduces the composition of the premium rate of Inherent Defects Insurance, and analyzes the the factors influencing the premium rate of the Inherent Defects Insurance.
... More