-
11830
-
3810
-
2659
-
2141
-
1515
Cost Estimation for Modernization of Metro Terminal Stations Using ANN Technique
DOI:
https://doi.org/10.30564/jmser.v1i1.207Abstract
The current situation of Cairo metro stations, especially terminal stations and its surrounding areas, has bad financial revenue and bad effect on environment. It is a major factor in increasing of noise, traffic jam and air pollution, in addition to, spreading of street vendors, collecting of random parking around these terminal stations. Thus, this paper proposed a methodology helping to apply multilateral investments in metro terminal stations for getting extra profits and decreasing the bad environmental effect of terminal stations and its surrounding areas. Hence, Helwan-Metro station on line 1 has been considered as a case study. Number of passengers at peak time, their ages, and their destinations, have been considered by making a field survey and a questionnaire. After collecting data and finalizing the surveying questionnaire, primary studies were done to modify and introduce a new proposal for Helwan-Metro station. The initial cost of the proposed project is predicted by using Artificial Neural Network technique using Just NN software. The investment feasibility achieved by consideration of Life Cycle Cost analysis and calculation of Net Present Value (NPV) of the proposed project.
Keywords:
Railways; Terminal stations; Cost; Artificial neural network; Net present value; MetroReferences
[1] Ahmed Khalil, (2009), "Engineering of Railways and Metro lines"1st edition, scientific book house.
[2] Arrington, G. B. and Cervero, R. (2008). "Effects of TOD on Housing, Parking and Travel", Transportation Research Board, pp. 1-58.
[3] Cabe and Detr, (2001), “The value of Urban Design”,.
[4] Cervero, R., S.Murphy, C. Ferrell, N. Goguts, Y. Tsai, G. B. Arrington, et al. 2004. “Transit-oriented development in the United States: Experiences, challenges, and prospects”, (TCRP 102). Washington, DC: Transportation Research Board.
[5] Chiara, J.D., (1995), "Time-saver Standards for Housing and Residential Development". 2nd ed. U.S.A: Mc Graw-Hill, Inc.
[6] Dimiter Dobrev, (2004), "A Definition of Artificial Intelligence" Institute of Mathematics and Informatics, Bulgarian Academy of Sciences, Sofia 1090, Bulgaria.
[7] D. Jawad, and K. Ozbay, 2006 “The Discount Rate in Life Cycle Cost Analysis of Transportation Projects,” 85th Annual Meeting of the Transportation Research Board, National Academy of Science, Washington, D.C., pp. 1-19.
[8] Ismaail ElSawy, Hossam Hosny and Mohammed Abdel Razek, (2011), "A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt" IJCSI International Journal of Computer Science Issues, Vol. 8, Issue 3, No. 1, ISSN (Online): 1694-0814.
[9] Lin Zaw, Theingi Shwe and MaungHlaing, (2014),"Studies of the Status of Central Business District Area (CBD) in Yangon, Myanmar" International Journal of Emerging Technology and Advanced Engineering, Volume 4, Issue 5.
[10] M. El Bardisi, 2005 “ Sources of Noise in Greater Cairo Example East Cairo” Ain Shams University Faculty of Engineering, Cairo, Egypt.
[11] Matt Fisher, (2001), "Japan Real-Estate Class" Building Coverage Ratio / Floor-Area Ratio, Ministry of Land, Infrastructure and Transport. Urban Land Use Planning System in Japan.
[12] Megha Jain and KK Pathak, (2014), "Applications of Artificial Neural Network in Construction Engineering and Management-A Review" International Journal of Engineering Technology, Management and Applied Sciences, Volume 2 Issue 3, ISSN 2349-4476.
[13] Mequanint Biazen and Tesfu Alemu, (2005), "Railway Mini-Station Design At Minlik Square" School of Electrical and Computer Engineering Railway System Planning and Operations Management [MEng 6409].
[14] Michael Nielsen, (2014), ''Neural Networks and Deep Learning" 1st edition, pp. 2-37.
[15] Mohammad H. Bataineh, (2012), "Artificial neural network for studying human performance" University of Iowa.
[16] Network Rail, Annual report, (2011).
[17] Neville Moss, and Albert Hoogland, (2013), "What Makes A Good Secondary Shopping Center?" A Shopping Centre Management.
[18] Öntepeli,M., (2005),"Conceptual Cost Estimating of Urban Railway System Projects". Middle East Technical University.
[19] Palo Alto, (2003), "What is Floor Area Ratio (FAR)?" Comprehensive Plan 2005.
[20] Paul Plummer, (2011), "Investment in stations, a guide for promoters and developers", (Version 2.0). Network Rail.
[21] PWC (2013), “Which financial mechanisms for urban railway stations?”, A study has been submitted to La Fabrique de la Cite.
[22] Reza Kheyroddin, Aliakbar Taghvaee and Amir Forouhar, (2014)," The Influence of Metro stations Development on Neighborhood Quality: The case of Tehran Metro Rail system." International review for spatial planning and sustainable development, Vol.2 No.2, pp. 64-75.
[23] S. D. Gleave, (2011), “The value of Station Investment, Research on regenerative impacts, A report submitted to Network Rail.
[24] S. k. Fuller, and S. R. Petersen, 1996 “Life-Cycle Costing Manual for the Federal Energy Management Program,” 1995 ed., NIST handbook, 135.
[25] S. Fuller. (2010). “Life-Cycle Cost Analysis (LCCA),”Whole Building Design Guide (WBDG), National Institue of Building Science, [Online]. Available: http://www.wbdg.org/resources/lcca.php.
[26] S. Kandee, 2001, “Intermodal Concept in Railway Station Design” www.bu.ac.th/knowledgecenter/epaper/jan_june2004/somruedee.pdf, accessed August 2015.
[27] Saumya Bajpai, Kreeti Jain, and Neeti Jain, (2011). "Artificial Neural Networks" International Journal of Soft Computing and Engineering (IJSCE), ISSN: 2231-2307, Volume-1, Issue-NCAI2011, India.